PRODUCT
250SLTX 300SLTX 350SLTX 400SLTX 450SLTX 500SLTX 600SLTX 700SLTX 800SLTX 900SLTX mechanical seal
250SLTX 300SLTX 350SLTX 400SLTX 450SLTX 500SLTX 600SLTX 700SLTX 800SLTX 900SLTX mechanical seal
Structural features:
Single end face (double end face) cartridge mechanical seal. Easy to install and simple to use. Balance, arbitrary rotation.
The internal working length is short. The static ring compensation multiple springs are externally not in contact with the medium.
Applicable medium:
Medium containing high impurity content such as gypsum and lime slurry.
Working parameters:
Fixed content: ≤30%
Temperature: ≤280℃
Pressure: ≤2.5MPa
Shaft diameter: ≤200mm
Material parameters:
Body material: 316L or 2205, 2507, 1.4529
Seal ring material: SSiC or SiC
Rubber material: fluorine rubber or perfluoroether rubber
main application:
This type of mechanical seal is mainly used for flue gas desulfurization of coal-fired power generation, and is suitable for absorption tower slurry circulation pump, gypsum slurry pump, limestone slurry pump, and gypsum discharge pump.
Common pump numbers are as follows:
250SLTX 300SLTX 350SLTX 400SLTX
450SLTX 500SLTX 600SLTX 700SLTX
800SLTX 900SLTX 1000SLTX
Installation and use requirements:
1. The radial runout of the shaft of the equipment should not be greater than 0.04 mm, and the axial runout is not allowed to be greater than 0.1 mm;
2. The sealing cavity of the equipment should be kept clean during installation, the sealing parts should be cleaned, and the sealing end face should be intact to prevent impurities and dust from being brought into the sealing part;
3. It is strictly forbidden to knock or knock during the installation process, so as not to damage the mechanical seal due to friction and seal failure;
4. During installation, the surface in contact with the seal should be coated with a layer of clean mechanical oil for smooth installation;
5. When installing the static ring gland, the tightening screws must be evenly stressed to ensure that the end face of the static ring is perpendicular to the axis line;
6. Push the moving ring by hand after installation, which can make the moving ring move flexibly on the shaft and have certain flexibility;
7. Rotate the shaft by hand after installation, and the shaft should not feel light or heavy;
8. The equipment must be filled with medium before operation to prevent dry friction and seal failure;
Service hotline:0813-3202978
Working days: Monday to Saturday
Time:8:30-18:00
Tell:
0813-3202978
Email:
Consulting:
13890019297
Zigong Chuanmi Mechanical seal Co., LTD 蜀ICP备12011709号-1